NIOZ > Varen > Scheepsjournaal > 64PE367 - Dagb...
A A A

64PE367 - Dagboek 5

05/04/2013 10:52

The recovery of the mooring starts with rubber-boat assistance to attach lines to the release beacon and empty aluminium LOM (see photo, taken 2 days ago). Today we could not do this because of the wind-conditions. It is planned for tomorrow.

LOM at the surface

When the Pelagia has winched-in all lines and cable a sea-street of glass-spheres is floating behind us (below, left). During both recoveries so far, dolphins accompanied the glass spheres to the surface.

 Floating at the surface  Glass spheres hoisted on deck
 On deck

One by one the glass spheres are hoisted on deck (above, top-right). They are unscrewed from the lines and stored separately. Note the old-dutch cheese-carriers-tool to take them to their Piet-made storage box (above, bottom-right).

Ga terug