05/04/2013 10:37
The recovery of the mooring starts with rubber-boat assistance to attach lines to the release beacon and empty aluminium LOM (see photo, taken 2 days ago). Today we could not do this because of the wind-conditions. It is planned for tomorrow.
When the Pelagia has winched-in all lines and cable a sea-street of glass-spheres is floating behind us (below, left). During both recoveries so far, dolphins accompanied the glass spheres to the surface.
| |
|
| |
One by one the glass spheres are hoisted on deck (above, top-right). They are unscrewed from the lines and stored separately. Note the old-dutch cheese-carriers-tool to take them to their Piet-made storage box (above, bottom-right).